Delta Corporation

Project Overview

Fortec was engaged by Delta Corp to carry out the supply, installation, stressing and testing of 16 No 1000kN WL active permanent hold down anchors.

The permanent anchors were required to hold down 92m long prestressing bed for major bridge precast girder forms.

Fortec works were completed along the surface of the bridge girder concrete tub/form with Fortec’s specialist tight access plant and equipment without disruption to precast production schedules and maintained a safe and functional work environment.

Fast Facts

  • CLIENTDelta Corporation
  • LOCATIONHerne Hill, WA

Scope of Works

  • Early design and contractor involvement to provide optimised design, construction and access solutions
  • Supply, drilling, installation and stressing of 16 No permanent high grade stress bar DCP ground anchors
  • Supply and installation of pressure grouted ground stabilisation for ground improvement via grout packer for anchor drilling

Highlights

  • 16 No Permanent Active anchors were carried out efficiently and remained LTI and NCR free
  • The project was completed on time and to client satisfaction
  • Completed safely in an operational work environment with no disruption to business