Fortec was awarded the contract to design and construct the podium level post tensioned slab.
The design consisted of approximately 1240m2 of suspended slab for area with 10T of PT and 28T of reinforcement.
26 on Charles is a mixed-use development with four levels of sophisticated commercial tenancies and 28 residential apartments from the podium levels above on Charles Street, South Perth.