As part of their maintenance program, MRWA engaged
Fortec, through its parent company Ertech, to complete
repairs and pile potting of bridges 834, 3022A, 801 and
839A.

Details

The scope included:

  • Traffic management – bridge 839A lanes on bridge reduced down to single lane closures with traffic lights either side of bridge.
  • Minor earthworks and dewatering.
  • Concrete repairs using LA55 / Monotop 412.
  • Prop bridge deck.
  • Water jet/blast surfaces.
  • Concrete repairs using Dekguard Elastic / Sikgard Elastic.
  • Grit blasting.
  • Concrete pile pots.
  • Clearing of site.

Highlights

  • Bespoke formwork shutters created for pile pots.
  • All pots formed up at one time to allow for one concrete pour.